At Paramount Kitchens Design our first step is to have a conversation to identify the project and to begin to build a lasting relationship. At this first meeting it is important to discuss the expectations of the client and provide an estimated cost analysis.
The next meeting is held at the factory where the client can tour the factory and showroom. After this meeting we begin the design process, which includes preparing multiple 3D CAD drawings. These drawings are presented to the client at the factory showroom. At this meeting all decisions related to the project, such as door styles, stains, and moldings are selected.
The manufacturing and installation process has 3 steps: Step one is taking final field measurements based on the CAD drawings; Step two is the manufacturing of the cabinets; Step three is the installation of the cabinets and moldings.